Tuesday, August 21, 2012

1 room down, 3.5 to go

The bathroom remodel has been substantially finished for some time, just awaiting an over the toilet cabinet. After some hassle, we had one made, patterned after a no longer available model from Lowes. At least this is real wood/plywood, but at substantially higher cost, but made locally.

New floor, paint, granite counter top, painted the oak vanity, added a beadboard wainscotting.

Next we move out for about a month while the wallpaper in the living room, hall, dining room and kitchen is removed, then the walls painted. After that, the oak floors get redone. A moving and storage Co will be here at the end of the month to put most of the stuff from these rooms in storage for the duration.

1 comment:

  1. It's beautiful! Must be a hassle to move out for a reno. Hope it goes well and fast.

    ReplyDelete