Sunday, October 07, 2007

More progress

I found out that the tile guy who had yet to return my phone calls, would be working next door today, so I called and he came over and did our small patch of tiles (Sans grout, which must wait two weeks until he gets back from a vacation). Also you can see the cool doors on the shower enclosure.

And here are the sconce lights installed by none other than moi.

Just talked to the phantom plumber who promises to be there sometime Tues, after which we can call for a final inspection.

Also spent three hours yesterday getting the stove in correctly. I eventually had to cut off another 1/8inch on each side of the front lip of the granite to accomodate a couple of screws on the stove. And the downdraft vent hose hookup, and the leveling, oh the leveling!